Location: Mueang District, Samut Prakan Province
Client Name: Marubeni
End User: EGAT
Project Overview: The project consists of the replacement of an existing unit of South Bangkok Power Plant 1-5 which has been decommissioned in 2018. The new power plant is a single-shaft combined cycle power plant with a net capacity of 1,234.3 MW. It uses natural gas as primary fuel for electricity generation and diesel as a supplementary fuel. The power plant is located in Bang Prong Sub-District, Mueang Samut Prakan District, Samut Prakan Province, which is the current location of the South Bangkok Power Plant
Product: Plume Abated Cooling Tower
Hamon-B.Grimm supplied the plume abated (hybrid) Cooling tower in back to back arrangement with size 24 cells. This is one of the biggest plume abated cooling in South East Asia.
Our services: Mechanical Design /Material supply / Supervision
Completion Date: Year 2020