BPRP 1250MW (EGAT)

Location: Bang Pakong District, Chachoengsao Province
Client Name: Black&Veatch
End User: EGAT
Project Overview: This project consists of the replacement existing units 1 and 2, which were no more in operation at the facility since 2014. It will have a capacity of 1,300 MW, compared to the combined 1,050MW of the two decommissioned units. The project is expected to be completed in 2021

Product: Plume Abated Cooling Tower
Hamon-B.Grimm supplied the plume abated (hybrid) Cooling tower in back to back arrangement with 24 cells. This is first plume abated cooling tower with Precast concrete structure. Hamon-B.Grimm cooling tower design was perfectly adapted to the application.

Our services: Mechanical Design / Structural design / Material supply / Supervision
Completion Date: Year 2021